SBB, Beton, Betonbecken, Beutler und Lang, SBB

DE / EN / IT
Betonbecken

Construction types

Rainwater tanks

regenwasserbecken Rainwater retention, overflow and clearing tanks ATV, sedimentation systems

Drinking water tanks

Trinkwasserbehälter Drinking water tanks, sliding chambers

Clearing tanks

Kläranlagen Pre and post-clarification tanks, activation tank, sludge storage tanks, SBR reactors, mixing and compensating reservoirs

Separation and overflow structures

Überlaufbecken Partition tanks with baffle walls or fitted lamella rakes

Sprinkler / fire water tanks:

Sprinkler-und Löschwasseranlagen Partition tanks with baffle walls or fitted lamella rakes

Rainwater cisterns

Regenwassernutzung Storage cisterns, filter shaft, seepage tanks

Geometry

Behälterdimensionen Diameters from 2.50 m to 50.00 m
Heights from 1.50 m to 15.00 m
Storage volumes from 15 m3 to 15,000 m3

Biogas tanks

Regenwassernutzung Reception pit, fermenter, post-fermenter, finals storage site, cogeneration unit building

Special tanks

Round tank constructed in a lowering process

Restoration

Optimisation of standard steel or concrete tanks by retrofitting walls

Construction method

Reinforce concrete construction

Version

Underground and elevated tanks

Roof loads

Live load: 5 KN/m2, 12to LKW, 30 to SLW, 60 to SLW, soil covering, special loads

Static system

Open or with a ceiling (freely suspended / central support / ring carrier or wall)

Technology

All constructions are erected using prefabricated reinforced concrete. The benefits: Shorter construction times, more economic. They correspond to the DIN standards EN 206-1, 1045-2 and 1045-3.

The SBB patented formwork system guarantees that the systems remain highly leak-proof in the long-term. Flexible large format formwork elements allow precise circular constructions. Concrete surfaces that are permanently free of pores and blowholes on the outer and inner walls are created using non-absorbent, absorbent or draining formwork surfaces and the unique SBB concreting process. Construction parts such as base plates, ring walls or ceilings are therefore free of through-tie, free of working joints and monolith. Horizontal work joints between construction parts are created in accordance with DIN 18541.

>> continue with How the formwork system works

Login

User name:
Password:

SBB Beutler & Lang Schalungs- und Behälter-Bau GmbH © 2009 | Company details